TìmNhàGầnĐây
Tất cả tin tức
Tổng hợp thông tin bởi TìmNhàGầnĐây

HCMC Coastal Road Nears Completion After Three Years of Construction

Đăng ngày 5 tháng 6, 2026 · Tổng hợp tin từ 4 thg 6 đến 5 thg 6

A coastal road in HCMC connecting toward Lam Dong has been progressively opened to traffic after nearly three years of works, improving transport, tourism, and coastal economic links. Separately, a historical feature on the Thu Thiem tunnel under the Saigon River highlights the engineering foundations underpinning HCMC's eastward urban expansion.

  • CafeF reports that the HCMC coastal road, after nearly three years of construction, is being completed in sections and opened for use, with the project described as enhancing transport connectivity, tourism, and coastal economic activity in the city [17].
  • The same report notes the route connects HCMC to Lam Dong province, suggesting potential relevance for buyers and investors tracking south-coastal and inter-provincial corridor development [17].
  • CafeF also highlights the Thu Thiem immersed tunnel beneath the Saigon River — constructed using over 100,000 tonnes of concrete sunk 27 metres deep — describing it as the largest river tunnel in Southeast Asia and a key piece of infrastructure connecting District 1 and the Thu Duc City (former District 2) urban zones [11].
  • In Hanoi (for context on large-scale urban project momentum nationally), CafeF reports that two mixed-use urban developments totalling approximately 1,400 ha in Dong Anh and Me Linh — backed by a Sunshine Group joint venture — are being accelerated, with land clearance at the Dong Anh site exceeding 166 ha [1].
  • Sun Group's multipurpose performance venue in Phu Quoc, with a capacity of over 4,000 seats and designed to host APEC 2027, is reported by CafeF as under development — a data point for investors tracking resort-island and event-driven real estate outside HCMC [19].

Nguồn

  1. [1]
  2. [11]
  3. [17]
  4. [19]

Note: This insight was AI- synthesised from the sources above. We don't predict prices or recommend buy/sell timing. For decisions on a specific property, talk to a property agent. Nothing here is financial or investment advice.

HCMC Coastal Road Nears Completion After Three Years of Construction - Tin tức thị trường bất động sản | TìmNhàGầnĐây